If a resource consent is required, it must be applied for before a building consent. If the proposed work is completely internal, it may not require a resource consent – but a building consent may still be necessary.
Thereof Do I need a resource consent to build a garage? Building a new garage will always require a building consent. …
How long is resource consent? The decision on your resource consent application must be issued within 15 working days of the hearing (total timeframe from start to finish of 100 working days) If no hearing is required, the decision must be issued within 20 working days of the close of submissions (60 working days).
Similarly, How long does a resource consent last?
In most cases, for resource consents you have five years from the day the consent is granted to fulfil the purpose and conditions of consent. However, you need to check the conditions on your consent for any specific time frames.
Do you need resource consent to build a deck?
If you plan to build a deck that is up to 1.5m high, you don’t need a building consent but you may still need a resource consent, depending on the rules in the Proposed Auckland Unitary Plan. If your deck is more than 1m high, it must have a handrail.
Do you need resource consent for a shed? Single-storey detached buildings include sleepouts, sheds, greenhouses and other similar structures can be built without a building consent. … Any plumbing work to a new or current building still requires a building consent, and any electrical work will still have to be carried out by a registered electrician.
Do you need consent to build a pergola?
Pergolas don’t require a building consent.
Do I need a consent for a carport? A carport is a shelter for vehicles. It must have a roof supported by posts and at least one side open at all times. Building a new carport greater than 40 square metres will always require a building consent.
What happens if you don’t get resource consent?
Failing to have a consent
You are breaking the law if you carry out building work that is not exempt and do not have a building consent. You may be fined up to $200,000 and, if work continues, a further fine of up to $20,000 for every day or part day during which the offence continues.
How do you process a resource consent? Resource consent applications are processed through a number of stages including requesting further information, making a decision on notification, receiving public submissions, holding pre-hearing meetings, holding a public hearing and issuing a decision.
Who applies for resource consent? The applicant for a resource consent does not need to be the owner of land, or to have any interest in the land, in order to apply for a consent. This means purchasers of land can apply for resource consents for land which they are considering purchasing.
Does a resource consent lapse? A resource consent will lapse on the date specified in the consent, or if no date is specified, five years after the commencement of consent, unless the consent is given effect to, or application is made to the consent authority to extend the lapse period having regard to substantial progress and other matters set out …
What is a land use consent?
A land use resource consent is required for an activity that affects the environment. This includes: building and alterations. earthworks. retail.
How long does it take to get a resource consent Auckland Council?
A planner will assess your application within 20 working days and will keep you updated on its progress. For non-notified applications, if we take longer than 20 working days to assess your application, you are entitled to a discount under the Resource Management (Discount on administrative charges) Regulations 2010.
How long does resource consent take Auckland? Notified applications for resource consents take around four to six months to process, depending on the complexity, significance and the level of contention involved.
Do you need building consent to renovate a bathroom? You don’t need a building consent for work listed if it is listed as exempted under Schedule 1 of the Building Act 2004. You are unlikely to require a building consent to: re-position or replace sanitary fixtures (e.g. a bath, bidet, wash hand basin, shower or toilet pan) within an existing home bathroom.
Can you build a lean to without planning permission?
You can add a lean-to conservatory without planning permission to your home, as long as it is within the boundaries of your property and doesn’t cover over 50% of the total area.
What is the maximum size you can build without planning permission? You can build a garage or outbuilding on your property without planning permission as long as it’s of a reasonable size – no higher than 4 metres.
Can I put shed up against fence?
But generally, you need to maintain at least 5 feet between the further edge of your shed and the fence. We also recommend double-checking your city code to see if more distance is necessary for your area.
Do I need consent for a patio? If your porch or veranda is close to a boundary, and you have the written approval from your neighbours, you can apply for a Deemed Permitted Boundary Activity. This application replaces the need to apply for a resource consent. You will still need to apply for a building consent, if required.
Can I build a pergola next to my fence?
Technically, you can still attach a pergola to your fence assuming the fence is built to specification. When attaching a pergola to a fence it should be done so properly with four strong posts and metal fasteners. There are several factors that should be considered before attaching a pergola to any fence.
Do you need planning consent for a gazebo? In most cases, you do not need planning permission for temporary structures, such as popup gazebos. … However, if you’re unsure of your local ordinances (or you plan to leave the temporary gazebo up for more than a few days), it’s better to seek advice from your local council.