NZS 3604 is New Zealand’s most sought-after standard. It provides methods and details that are used to design many NZ timber-framed houses and small buildings, including many residential decks.

Timber-framed buildings.

Get this standard Prices exclude GST
Online Library ( Annual subscription) Info Price varies Subscribe

• 14 feb. 2011

Thereof Can a residential garage floor be designed from NZS 3604? Garages over 30 m2 can be constructed using NZS 3604:2011, but will be restricted by: the maximum construction space of 7.5 m x 7.5 m when dragon ties are used to extend the bracing grid from 6.0 m to 7.5 m (see NZS 3604:2011 clause 8.3.

What depth stud is used for standard external wall framing in New Zealand? Timber is renewable, strong and is adaptable as a building material – which is a critical factor when it comes to bespoke architectural design. Standard wall framing is 90mm thick, however we generally go above and beyond ‘standard’.

Similarly, What is a loaded dimension?

loaded dimension is a measure of the weight of construction that contributes to the member under consideration.

Which table in NZS 3604 2011 gives the sizes for bearers?

Bearers. Bearer sizes are selected from NZS 3604:2011 Table 6.4 Part (b) for a 2kPa wet-in-service floor load (NZS 3604:2011 6.12). They must: Be continuous over two or more spans.

What is the Building Code NZ? The Building Code is contained in regulations under the Building Act 2004. The Act governs the building sector and also sets out the rules for the construction, alteration, demolition and maintenance of new and existing buildings in New Zealand.

Do I need a permit to build a deck NZ?

If you plan to build a deck that is up to 1.5m high, you don’t need a building consent but you may still need a resource consent, depending on the rules in the Proposed Auckland Unitary Plan. If your deck is more than 1m high, it must have a handrail.

How far can a bearer overhang a pile? Overhangs. For overhanging joists, Blocking and End Trimmer are required as per diagram. The maximum permissible overhang is 30% of the backspan.

How deep should deck posts be NZ?

Piles should be spaced at maximum centres of 1.3m along the lines of the bearers and at maximum centres of 1.9m along the lines of the joists. Dig holes with a post hole borer or a spade to a minimum depth of 450mm plus an extra 100mm for concrete pad. Clean out holes of any loose material.

What is the latest Building Code? The International Code Council (ICC) promulgates a new International Building Code every 3 years through the ICC Code Development Process. As such, the current version of the IBC is the 2021 edition, also known as ICC IBC-2021.

How many Building Code clauses are there in NZ? Structure of the Building Code. The Building Code consists of three general clauses and 38 technical clauses.

What is Code of Compliance NZ? A Code of Compliance (CCC) is a formal statement confirming that the building work carried out on a property is compliant to the building consent issued by a local authority. An owner of a property owner must apply for a CCC once all the work has been completed and inspected.

What can you build without a permit in NZ?

Building projects that are now exempt from needing a permit are:

  • Single storey, detached buildings up to 30m2.
  • Carports with a maximum floor area of 40m2.
  • Awnings, verandahs and porches with a maximum size of 30m2.
  • Detached single storey pole sheds and hay barns.

How close can you build a deck to your boundary NZ?

If the deck is attached to the dwelling in a Residential Suburban, Residential Suburban Density Transition, Residential Hills or Residential Large Lot zone, and is at ground floor level or below, it can be constructed right up to the internal property boundary as long as any parts within 1m of the boundary are 300mm or

How high can you build a deck NZ? A building owner constructs a 50 square metre deck with a maximum height of 900 mm above ground and attached to two sides of a building. Even if the deck were to collapse, the fall would be less than 1.5 metres.

How far apart do bearers have to be for a deck? Set up the bearer spacings at a minimum of 1800mm centres with stump holes no more than 1500mm apart. The outside run of stumps will need to align with the outside edge of the deck.

How far apart should house piles be?

Piles were installed to a minimum depth of 300 mm or to solid bearing, and were required to finish 150-350 mm above cleared ground level. They were equally spaced in rows to give a maximum bearer span of 1350 mm, and rows were spaced 1.6-4.5 m apart (joist span).

What is the difference between joists and bearers? Bearers are the timber or steel that attaches directly to the stumps in the ground, that supports the deck of flooring structure. Joists are the timbers that then attach across the top of the bearers, after which the timber or particle board floor is then attached.

How far apart should joists be on a deck NZ?

Joist spacings are in the manufacturer’s instructions and are generally between 400 and 450 mm. 1–2 mm gaps at butt-jointed ends. End joints should be butted and must be made over joists. Scarf joints can be used but may leave a sharp edge when the timber shrinks.

How far apart should footings be for a deck? The standard rule for footings is that for a basic deck, the larger the beam and footing size, the fewer footings you’ll need. If you’re building a simple deck, footings and posts should be placed 8 feet apart on average.

How far can you cantilever a deck NZ?

As the line of support (i.e. piles and bearer) is 2.1 m from the house, according to NZS 3604 Table 7.1(b) (2 kPa floor load and wet in service), 140 × 45 mm joists may be used, and Table 7.2 for cantilevered joists allows a cantilever of up to 1150 mm.

What is Title 24 building code? Q: What is Title 24? Title 24 California Building Standards Code is a broad set of requirements for “energy conservation, green design, construction and maintenance, fire and life safety, and accessibility” that apply to the “structural, mechanical, electrical, and plumbing systems” in a building.

Is NYC building code based on IBC?

NYC Building Code 2014 based on the International Building Code 2009 (IBC 2009)

How often is the IBC updated? The codes are updated every three years. Work done before a certain code was implemented might be grandfathered in (check with your local permitting office). ICC itself offers a partial text of the IBC and IRC for free online.

Is the NZ Building Code prescriptive or performance based?

New Zealand’s building regulatory system is performance-based. Performance-based regulation focuses on how a building must perform in its intended use.

How high can a new home be built NZ? Anything you build will still need to meet the new standards. That means whatever you build can be up to three storeys high and cover up to 50 per cent of a plot of land. You can take up an extra 10 per cent (rounding up to 60 per cent of the land) including pavement.

Can you sell a house without code of compliance? Owning a property without any required code compliance certificate may affect the property value and your ability to sell the property. It may also affect your ability to insure the property and borrow money against the property, depending on the extent of work done.